Container and General Cargo Terminals

DOCK SUD WIDENING CHANNEL

PROJECT: NAVIGABLE CHANNEL WIDENING FOR OPERATION OF FULL CONTAINER SHIPS

CLIENT: EXOLGAN CONTAINER TERMINAL

LOCATION: DOCK SUD CHANNEL – BUENOS AIRES, ARGENTINA

PERIOD: 2003 / 2015 (IN STEPS)

INVESTMENT: U$S 100.000.000

WORKS OF THE FIRM:

  • PROJECT
  • CONSTRUCTION MANAGEMENT